top of page

Mining Projects

Victoria Gold:

Nuway Crushing supplied crushing services for both the construction and operational phases. During site construction, engineered specification materials were required for the underdrain and overliner collection systems. Once operations commenced, Nuway provided crushed ore, stemming, and road material to support mine production.

Minto Mine:

Nuway provided services similar to Victoria Gold to the Minto Mine, producing zone materials for a tailings dam that was later converted into a water storage pond for mill operations. Once the mine became operational, ongoing crushing challenges arose. Nuway was called in to crush the ore feed, ensuring smooth and efficient operations.

Red Chris:

Nuway provided crushing services to produce different zoon materials for a dam raise and road material.

Golden Bear:

Nuway crushed all the ore that was placed in the heap leach facility (HLF) during operations.

Other:

Nuway also provided crushing services for the Faro and Kemess mine sites.

© 2023 by My Site. All rights reserved.

bottom of page